Tas Montessori School
8 serious findings across 20 visits in the last 36 months. Most recent serious finding: Jun 30, 2026.
502 Dowden Rd Ste 100, Wolfforth, TX 79382 · (806) 783-0054
Texas lists conditions on this permit. Read them on the state record.
At a glance
Texas HHSC operation #1717207 · last checked against Texas Sep 15, 2026
Programs and services
From the Texas license. A dash means the state does not list it for this daycare.
- Meals providednot listed
- Snacks providednot listed
- Before-school carenot listed
- After-school careyes
- Transportation to/from schoolnot listed
- Drop-in carenot listed
- Part-time careyes
- Field tripsyes
- Skill classesnot listed
- Weekend carenot listed
- Night carenot listed
- Accreditednot listed
- Accepts child care subsidiesnot listed
Inspection record
Every visit Texas has published, newest first. Visits with findings are shown in full; runs of clean visits are folded into one line. Findings are quoted from the inspector's report with the Texas risk level beside our severity.
- 2026
- Jul 23, 2026 to Jul 23, 20264 inspectionsNo findingsShow
- Jul 23, 2026 inspection
- Jul 23, 2026 inspection
- Jul 23, 2026 inspection
- Jul 23, 2026 inspection
- Jun 30, 2026Assessment1 finding · serious
- SeriousTexas: Medium
Notification of Planned Closure
The operation did not notify Child Care Regulation Department of a planned closure date of 5 consecutive days: 6/29/2026 through 7/03/2026,
Corrected Jun 30, 2026, verified Jul 1, 2026. Technical assistance given. Standard 746.301(8).
- Jun 30, 2026Assessment1 finding · serious
- SeriousTexas: Medium
Notification of Planned Closure
The operation did not notify Child Care Regulation Department of a planned closure date of 5 consecutive days: 6/29/2026 through 7/03/2026,
Corrected Jun 30, 2026, verified Jul 1, 2026. Technical assistance given. Standard 746.301(8).
- Jun 30, 2026Assessment1 finding · serious
- SeriousTexas: Medium
Notification of Planned Closure
The operation did not notify Child Care Regulation Department of a planned closure date of 5 consecutive days: 6/29/2026 through 7/03/2026,
Corrected Jun 30, 2026, verified Jul 1, 2026. Technical assistance given. Standard 746.301(8).
- Jun 30, 2026Assessment1 finding · serious
- SeriousTexas: Medium
Notification of Planned Closure
The operation did not notify Child Care Regulation Department of a planned closure date of 5 consecutive days: 6/29/2026 through 7/03/2026,
Corrected Jun 30, 2026, verified Jul 1, 2026. Technical assistance given. Standard 746.301(8).
- 2025
- Jul 30, 2025 to Jul 30, 20254 inspectionsNo findingsShow
- Jul 30, 2025 inspection
- Jul 30, 2025 inspection
- Jul 30, 2025 inspection
- Jul 30, 2025 inspection
- 2024
- Oct 7, 2024Inspection1 finding · serious
- SeriousTexas: Medium High
Required Records Maintained and Made Available - Fire Inspection Report, Including Written Approval for Above/Below Ground Level Care
The operation's most recent Fire Inspection Report wasn't available for review during the inspection.
Corrected Oct 9, 2024, verified Oct 8, 2024. Standard 746.801(11).
- Oct 7, 2024Inspection1 finding · serious
- SeriousTexas: Medium High
Required Records Maintained and Made Available - Fire Inspection Report, Including Written Approval for Above/Below Ground Level Care
The operation's most recent Fire Inspection Report wasn't available for review during the inspection.
Corrected Oct 9, 2024, verified Oct 8, 2024. Standard 746.801(11).
- Oct 7, 2024Inspection1 finding · serious
- SeriousTexas: Medium High
Required Records Maintained and Made Available - Fire Inspection Report, Including Written Approval for Above/Below Ground Level Care
The operation's most recent Fire Inspection Report wasn't available for review during the inspection.
Corrected Oct 9, 2024, verified Oct 8, 2024. Standard 746.801(11).
- Oct 7, 2024Inspection1 finding · serious
- SeriousTexas: Medium High
Required Records Maintained and Made Available - Fire Inspection Report, Including Written Approval for Above/Below Ground Level Care
The operation's most recent Fire Inspection Report wasn't available for review during the inspection.
Corrected Oct 9, 2024, verified Oct 8, 2024. Standard 746.801(11).
- 2023
- Nov 27, 2023 to Nov 27, 20234 inspectionsNo findingsShow
- Nov 27, 2023 inspection
- Nov 27, 2023 inspection
- Nov 27, 2023 inspection
- Nov 27, 2023 inspection
Show 8 older visits, not counted aboveHide older visits
- 2022
- Dec 13, 2022Inspection2 findings · serious
- SeriousTexas: Medium
Maintenance Procedures for Active Play - Monthly Maintenance Checklist
During the inspection it was observed that the last documented maintence inspection was in June 2022. This was corrected at inspection as the director completed an inspection of all indoor and outdoor active play space and equipment and documented it.
Corrected during the inspection. Technical assistance given. Standard 746.4751(b).
- SeriousTexas: Medium High
Fire Drill Monthly - Exit in 3 Minutes
During the inspection it was observed that the last fire drill was conducted on 10/13/2022. This was corrected at inspection as the director conducted a fire drill.
Corrected during the inspection. Technical assistance given. Standard 746.5205(1).
- Dec 13, 2022Inspection2 findings · serious
- SeriousTexas: Medium High
Fire Drill Monthly - Exit in 3 Minutes
During the inspection it was observed that the last fire drill was conducted on 10/13/2022. This was corrected at inspection as the director conducted a fire drill.
Corrected during the inspection. Technical assistance given. Standard 746.5205(1).
- SeriousTexas: Medium
Maintenance Procedures for Active Play - Monthly Maintenance Checklist
During the inspection it was observed that the last documented maintence inspection was in June 2022. This was corrected at inspection as the director completed an inspection of all indoor and outdoor active play space and equipment and documented it.
Corrected during the inspection. Technical assistance given. Standard 746.4751(b).
- Dec 13, 2022Inspection2 findings · serious
- SeriousTexas: Medium
Maintenance Procedures for Active Play - Monthly Maintenance Checklist
During the inspection it was observed that the last documented maintence inspection was in June 2022. This was corrected at inspection as the director completed an inspection of all indoor and outdoor active play space and equipment and documented it.
Corrected during the inspection. Technical assistance given. Standard 746.4751(b).
- SeriousTexas: Medium High
Fire Drill Monthly - Exit in 3 Minutes
During the inspection it was observed that the last fire drill was conducted on 10/13/2022. This was corrected at inspection as the director conducted a fire drill.
Corrected during the inspection. Technical assistance given. Standard 746.5205(1).
- Dec 13, 2022Inspection2 findings · serious
- SeriousTexas: Medium High
Fire Drill Monthly - Exit in 3 Minutes
During the inspection it was observed that the last fire drill was conducted on 10/13/2022. This was corrected at inspection as the director conducted a fire drill.
Corrected during the inspection. Technical assistance given. Standard 746.5205(1).
- SeriousTexas: Medium
Maintenance Procedures for Active Play - Monthly Maintenance Checklist
During the inspection it was observed that the last documented maintence inspection was in June 2022. This was corrected at inspection as the director completed an inspection of all indoor and outdoor active play space and equipment and documented it.
Corrected during the inspection. Technical assistance given. Standard 746.4751(b).
- Jan 28, 2022 to Jan 28, 20224 inspectionsNo findingsShow
- Jan 28, 2022 inspection
- Jan 28, 2022 inspection
- Jan 28, 2022 inspection
- Jan 28, 2022 inspection
Source. This facility on the Texas HHSC search. Data reloaded nightly.
Think something here is wrong? Texas corrects its own records; here is how to ask them, and how to tell us. We change nothing ourselves.
Compare nearby
Licensed centers in zip 79382, same 36-month window.
| Daycare | Ages | Places | Hours | Findings, 36 mo |
|---|---|---|---|---|
| Tas Montessori School this page | Toddler–School | 85 | 7a–6p | 8 ser |
| Bennett Depot Child Care and Learning Center | Pre-K–School | 115 | 3p–6p | Clear |
| Reese Doodle Babies | Infant–Pre-K | 17 | 7:30a–4p | Clear |
| The Rising Stars Learning Academy | Infant–School | 61 | 6a–6p | 4 crit |
| Wolfforth Methodist Church the Vine | Pre-K–School | 40 | 3p–6p | 4 ser |
- Tas Montessori Schoolthis pageToddler–School · 85 places8 ser
- Pre-K–School · 115 placesClear
- Infant–Pre-K · 17 placesClear
- Infant–School · 61 places4 crit
- Pre-K–School · 40 places4 ser