Rocky Point Baptist Church Wee School
3595 C R 178, Stephenville, TX 76401
Toddler, Pre-Kindergarten, School · Monday–Friday
4 critical, 20 serious findings across 20 visits in the last 36 months. Most recent critical finding: Sep 24, 2024.
16 inspections · 4 investigations in 36 months · source checked Sep 16, 2026
The everyday details
State facts · provider details pendingSubsidies not accepted in state listing
See fees & availability →Meet Rocky Point Baptist Church Wee School
Provider profileThis provider has not supplied a description yet. Ask about their teaching approach, classroom routines, and what makes their program a fit for your child.
Photo not provided
Photo not provided
Photo not provided
No provider photos have been supplied. These are labeled placeholders, not images of the facility.
What care includes
- Meals providedNot listed
- Snacks providedListed
- Before-school careListed
- After-school careListed
- Transportation to/from schoolNot listed
- Drop-in careNot listed
- Part-time careNot listed
- Field tripsListed
- Skill classesNot listed
- Weekend careNot listed
- Night careNot listed
- AccreditedNot listed
- Accepts child care subsidiesNot accepted
“Not listed” means unknown, not unavailable.
See all programs, services & policies →Ask about the program.
Ask about the record.
Bring questions about tuition and fit alongside the findings, correction evidence, and gaps in this record.
Build my tour questions →Tuition, without the guesswork
Choose your needs to prepare a quote request. Rates have not been supplied by this provider.
Rate not provided
Care and schedule availability must be confirmed. Missing pricing does not mean care is free.
- Tuition & billing schedule
- Not provided
- Registration · refund terms
- Not provided
- Deposit · whether credited to tuition
- Not provided
- Meals & snacks
- Not provided
- Annual materials fee
- Not provided
- Late pickup fee
- Not provided
Understand your first month’s cost
Request tuition, required fees, deposit credit, and refund terms in writing. A deposit credited to tuition should not be counted twice. We cannot calculate a total without confirmed amounts.
Help with costs
The state lists subsidies as not accepted. Confirm current payment options. Sibling discounts have not been provided.
Openings & waitlists
No provider-confirmed availability has been supplied. An opening is not a reservation.
Toddler: availability not confirmed
Ask about your start date, classroom availability, waitlist fees, and when offers are made.
Licensed capacity: 90 children. This is not the number of open places.
Programs & learning
Toddler,Pre-Kindergarten,School
Before School Care,After School Care,Snacks Provided,Field Trips
Curriculum and teaching philosophy not provided.
Accreditation information not provided. Licensing does not establish accreditation.
State-sourced · checked Sep 16, 2026. Confirm current details with the provider.
A typical day
The daily schedule has not been supplied. Ask about arrival, meals, outdoor play, rest, learning activities, and pickup.
07:30 AM-05:30 PM
Mon,Tue,Wed,Thu,Fri
Services & accommodations
- Meals providedNot listed
- Snacks providedListed
- Before-school careListed
- After-school careListed
- Transportation to/from schoolNot listed
- Drop-in careNot listed
- Part-time careNot listed
- Field tripsListed
- Skill classesNot listed
- Weekend careNot listed
- Night careNot listed
- AccreditedNot listed
- Accepts child care subsidiesNot accepted
Languages spoken and interpreter availability not provided.
Care plans, dietary substitutions, and medication training need confirmation.
Entrance, restroom, and classroom accessibility details not provided.
Individual accommodations, specialist access, and staff training not provided.
People, policies & environment
Not listed
Not listed
Individual qualifications, CPR, and first-aid training not provided.
Current classroom staffing and ratios not provided. Ask on your visit.
Parent updates and conference policies not provided.
Authorized pickup and visitor procedures not provided.
Exclusion and return criteria not provided.
Holiday and staff-development calendar not provided.
Evidence, with the follow-through.
Provider descriptions, prices, and photos never change this record. Every finding below comes from published state evidence.
4 critical, 20 serious findings across 20 visits in the last 36 months. Most recent critical finding: Sep 24, 2024.
Last 36 months · window starts Sep 15, 2023
6 standard(s) appear on multiple visits: 746.4907(d) (4 visits); 746.5205(4) (4 visits); 746.5101(a) (4 visits); 746.1309(e) (4 visits); 746.1315(b)(1) (4 visits); 746.4135(b) (4 visits). This is a match of standard identifiers, not a judgment about identical circumstances.
Correction reported Sep 18, 2026; no verification date published.
Conditions between visits, current staffing, and day-to-day quality. A correction plan is not verification.
32 visits in our data; 0 unmatched findings. Publication and processing can lag events.
Check the latest finding’s evidence
Installation and Maintenance of Loose-fill Surfacing - Proper Depth Maintained
Loose-fill pea gravel at both playgrounds were under the required depths.
Correction reported Sep 18, 2026; no verification date published.
Inspection record
Visits available in our Texas data, newest first. Visits with findings are shown in full; runs of clean visits are folded into one line. Findings are quoted from the inspector's report with the Texas risk level beside our severity.
Inspection history is one input into your decision, not a guarantee of safety or a rating of care quality. How to read this record.
- 2026
- Aug 18, 2026Inspection2 findings · serious
- SeriousTexas: Medium High
Installation and Maintenance of Loose-fill Surfacing - Proper Depth Maintained
Loose-fill pea gravel at both playgrounds were under the required depths.
Corrected Sep 18, 2026. Technical assistance given. Standard 746.4907(d).
- SeriousTexas: Medium
Documentation of Drills
There was no documentation of severe weather or lock down drills for the previous 12 month period.
Correction verified Aug 28, 2026. Standard 746.5205(4).
- Aug 18, 2026Inspection2 findings · serious
- SeriousTexas: Medium
Documentation of Drills
There was no documentation of severe weather or lock down drills for the previous 12 month period.
Correction verified Aug 28, 2026. Standard 746.5205(4).
- SeriousTexas: Medium High
Installation and Maintenance of Loose-fill Surfacing - Proper Depth Maintained
Loose-fill pea gravel at both playgrounds were under the required depths.
Corrected Sep 18, 2026. Technical assistance given. Standard 746.4907(d).
- Aug 18, 2026Inspection2 findings · serious
- SeriousTexas: Medium High
Installation and Maintenance of Loose-fill Surfacing - Proper Depth Maintained
Loose-fill pea gravel at both playgrounds were under the required depths.
Corrected Sep 18, 2026. Technical assistance given. Standard 746.4907(d).
- SeriousTexas: Medium
Documentation of Drills
There was no documentation of severe weather or lock down drills for the previous 12 month period.
Correction verified Aug 28, 2026. Standard 746.5205(4).
- Aug 18, 2026Inspection2 findings · serious
- SeriousTexas: Medium High
Installation and Maintenance of Loose-fill Surfacing - Proper Depth Maintained
Loose-fill pea gravel at both playgrounds were under the required depths.
Corrected Sep 18, 2026. Technical assistance given. Standard 746.4907(d).
- SeriousTexas: Medium
Documentation of Drills
There was no documentation of severe weather or lock down drills for the previous 12 month period.
Correction verified Aug 28, 2026. Standard 746.5205(4).
- 2025
- Sep 4, 2025 to Sep 4, 20254 inspectionsNo findingsShow
- Sep 4, 2025 inspection
- Sep 4, 2025 inspection
- Sep 4, 2025 inspection
- Sep 4, 2025 inspection
- 2024
- Sep 24, 2024Inspection2 findings · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The operation did not have a current annual fire inspection.
Correction verified Sep 26, 2024. Technical assistance given. Standard 746.5101(a).
- SeriousTexas: Medium
Documented Annual Training- Required Content
4 caregivers did not have current annual training in hazardous materials. 1 caregiver did not have current training in allergies.
Correction verified Oct 16, 2024. Technical assistance given. Standard 746.1309(e).
- Sep 24, 2024Inspection2 findings · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The operation did not have a current annual fire inspection.
Correction verified Sep 26, 2024. Technical assistance given. Standard 746.5101(a).
- SeriousTexas: Medium
Documented Annual Training- Required Content
4 caregivers did not have current annual training in hazardous materials. 1 caregiver did not have current training in allergies.
Correction verified Oct 16, 2024. Technical assistance given. Standard 746.1309(e).
- Sep 24, 2024Inspection2 findings · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The operation did not have a current annual fire inspection.
Correction verified Sep 26, 2024. Technical assistance given. Standard 746.5101(a).
- SeriousTexas: Medium
Documented Annual Training- Required Content
4 caregivers did not have current annual training in hazardous materials. 1 caregiver did not have current training in allergies.
Correction verified Oct 16, 2024. Technical assistance given. Standard 746.1309(e).
- Sep 24, 2024Inspection2 findings · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The operation did not have a current annual fire inspection.
Correction verified Sep 26, 2024. Technical assistance given. Standard 746.5101(a).
- SeriousTexas: Medium
Documented Annual Training- Required Content
4 caregivers did not have current annual training in hazardous materials. 1 caregiver did not have current training in allergies.
Correction verified Oct 16, 2024. Technical assistance given. Standard 746.1309(e).
- 2023
- Dec 14, 2023Inspection2 findings · serious
- SeriousTexas: Medium High
CPR Training and Recertification Adhere to Guidelines-skill based
One caregiver's CPR training did not include in-person training using a CPR manikin.
Correction verified Jan 24, 2024. Technical assistance given. Standard 746.1315(b)(1).
- SeriousTexas: Medium
Children's Products- Annual Certification
The annual Children's Products Certification was past due.
Correction verified Dec 15, 2023. Technical assistance given. Standard 746.4135(b).
- Dec 14, 2023Inspection2 findings · serious
- SeriousTexas: Medium High
CPR Training and Recertification Adhere to Guidelines-skill based
One caregiver's CPR training did not include in-person training using a CPR manikin.
Correction verified Jan 24, 2024. Technical assistance given. Standard 746.1315(b)(1).
- SeriousTexas: Medium
Children's Products- Annual Certification
The annual Children's Products Certification was past due.
Correction verified Dec 15, 2023. Technical assistance given. Standard 746.4135(b).
- Dec 14, 2023Inspection2 findings · serious
- SeriousTexas: Medium
Children's Products- Annual Certification
The annual Children's Products Certification was past due.
Correction verified Dec 15, 2023. Technical assistance given. Standard 746.4135(b).
- SeriousTexas: Medium High
CPR Training and Recertification Adhere to Guidelines-skill based
One caregiver's CPR training did not include in-person training using a CPR manikin.
Correction verified Jan 24, 2024. Technical assistance given. Standard 746.1315(b)(1).
- Dec 14, 2023Inspection2 findings · serious
- SeriousTexas: Medium
Children's Products- Annual Certification
The annual Children's Products Certification was past due.
Correction verified Dec 15, 2023. Technical assistance given. Standard 746.4135(b).
- SeriousTexas: Medium High
CPR Training and Recertification Adhere to Guidelines-skill based
One caregiver's CPR training did not include in-person training using a CPR manikin.
Correction verified Jan 24, 2024. Technical assistance given. Standard 746.1315(b)(1).
- Dec 1, 2023 to Dec 1, 20234 investigationsNo findingsShow
- Dec 1, 2023 complaint investigation
- Dec 1, 2023 complaint investigation
- Dec 1, 2023 complaint investigation
- Dec 1, 2023 complaint investigation
Show 12 older visits, not counted aboveHide older visits
- Feb 21, 2023 to Mar 24, 20238 inspectionsNo findingsShow
- Mar 24, 2023 inspection
- Mar 24, 2023 inspection
- Mar 24, 2023 inspection
- Mar 24, 2023 inspection
- Feb 21, 2023 inspection
- Feb 21, 2023 inspection
- Feb 21, 2023 inspection
- Feb 21, 2023 inspection
- 2022
- May 18, 2022Inspection2 findings · serious
- SeriousTexas: Medium High
Training Requirements for Employees and Caregivers - Pre-service Training
One caregiver did not have pre-service training within the required timeframe.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.1301(2)(A).
- SeriousTexas: Medium
Posting of Activity Plan
Two classrooms did not have posted activity plans.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.2209.
- May 18, 2022Inspection2 findings · serious
- SeriousTexas: Medium
Posting of Activity Plan
Two classrooms did not have posted activity plans.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.2209.
- SeriousTexas: Medium High
Training Requirements for Employees and Caregivers - Pre-service Training
One caregiver did not have pre-service training within the required timeframe.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.1301(2)(A).
- May 18, 2022Inspection2 findings · serious
- SeriousTexas: Medium
Posting of Activity Plan
Two classrooms did not have posted activity plans.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.2209.
- SeriousTexas: Medium High
Training Requirements for Employees and Caregivers - Pre-service Training
One caregiver did not have pre-service training within the required timeframe.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.1301(2)(A).
- May 18, 2022Inspection2 findings · serious
- SeriousTexas: Medium
Posting of Activity Plan
Two classrooms did not have posted activity plans.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.2209.
- SeriousTexas: Medium High
Training Requirements for Employees and Caregivers - Pre-service Training
One caregiver did not have pre-service training within the required timeframe.
Correction verified Jun 3, 2022. Technical assistance given. Standard 746.1301(2)(A).
Source. This facility on the Texas HHSC search. Data reloaded nightly.
Think something here is wrong? Texas corrects its own records; here is how to ask them, and how to tell us. We change nothing ourselves.
Facts from the license
- Permit
- Full Permit, issued Jan 6, 2006
- Capacity
- 90 children (licensed maximum, not openings)
- Ages
- Toddler, Pre-Kindergarten, School
- Hours
- 07:30 AM-05:30 PM · Mon,Tue,Wed,Thu,Fri
- Subsidies
- Not accepted
- County
- Erath
- Website
- www.rpweeschool.org
Compare nearby
Same 36-month summary window. Different operating histories and coverage limit comparisons.
| Daycare | Ages | Licensed capacity | Hours | Findings, 36 mo |
|---|---|---|---|---|
| Rocky Point Baptist Church Wee School this page | Toddler–School | 90 | 7:30a–5:30p | 4 crit·20 ser |
| Faith School | Infant–School | 160 | 7:15a–5:30p | 44 crit·32 ser |
| Grace Ridge Early Learning Center | Infant–School | 95 | 7a–5:45p | 8 crit·32 ser |
| Kinderbridge | Toddler–School | 65 | 7:45a–2:20p | 4 ser |
| Nurture 'n' Nature | Infant–School | 130 | 6:30a–6p | 8 crit·36 ser·4 min |
| Sunshine Christian Preschool | Pre-K | 37 | 8:30a–11:30a | Clear |
| Treehouse Afterschool Program | School | 41 | 3p–5:30p | 8 ser·4 min |
- Rocky Point Baptist Church Wee Schoolthis pageToddler–School · 90 licensed capacity4 crit·20 ser
- Infant–School · 160 licensed capacity44 crit·32 ser
- Infant–School · 95 licensed capacity8 crit·32 ser
- Toddler–School · 65 licensed capacity4 ser
- Infant–School · 130 licensed capacity8 crit·36 ser·4 min
- Pre-K · 37 licensed capacityClear
- School · 41 licensed capacity8 ser·4 min
Your tour, better prepared
- What will we pay in the first month, and what is refundable? Confirm how the deposit is credited.
- Is a place available for our age group and start date? Can you confirm that in writing?
- Who would be our child’s regular teacher, and how are absences covered? What are the current classroom ratios?
- What changed after the finding about “Installation and Maintenance of Loose-fill Surfacing - Proper Depth Maintained”? Can you show the correction evidence and how the procedure is checked today?
- The same standard appears on more than one visit. What has changed to prevent recurrence?
- How do you handle allergies, medication, accessibility, and additional support needs?
Enable JavaScript to save visit notes on this browser.
Contact & location
3595 C R 178, Stephenville, TX 76401
State-sourced · checked Sep 16, 2026. Confirm current details with the provider.
State records and provider information have separate sources. Provider claims do not establish independently verified care quality. Missing data is not evidence of an issue-free record.