Skip to content
cubbycheck
Licensed centerLicensed

Little Stars Child Development Center

4 critical, 32 serious findings across 32 visits in the last 36 months. Most recent critical finding: Jul 16, 2026.

8300 W. State Highway 191, Midland, TX 79707 · (432) 978-2704

Texas lists conditions on this permit. Read them on the state record.

At a glance

Safety · last 36 monthsMidland licensed centers, n=79
Critical findings4 critical, 32 serious, 0 minor across 28 inspections and 4 investigations (32 visits). Most recent critical: Jul 16, 2026.
Critical4 vs median 4
54% of centers have at least one
Serious32 vs median 4
59% of centers have at least one
QualitySince 2009Full Permit
Practical7:30a–5:30pMon–Fri · Infant to school · 58 places

Texas HHSC operation #904271 · last checked against Texas Sep 15, 2026

Programs and services

From the Texas license. A dash means the state does not list it for this daycare.

  • Meals providednot listed
  • Snacks providedyes
  • Before-school carenot listed
  • After-school carenot listed
  • Transportation to/from schoolnot listed
  • Drop-in carenot listed
  • Part-time careyes
  • Field tripsnot listed
  • Skill classesnot listed
  • Weekend carenot listed
  • Night carenot listed
  • Accreditednot listed
  • Accepts child care subsidiesyes

Inspection record

Every visit Texas has published, newest first. Visits with findings are shown in full; runs of clean visits are folded into one line. Findings are quoted from the inspector's report with the Texas risk level beside our severity.

  1. 2026
  2. Jul 16, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation did not have a current fire inspection report available for review. The last fire inspection was on 3/04/2025.

      Corrected Jul 30, 2026, verified Jul 24, 2026. Technical assistance given. Standard 746.5101(a).

  3. Jul 16, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation did not have a current fire inspection report available for review. The last fire inspection was on 3/04/2025.

      Corrected Jul 30, 2026, verified Jul 24, 2026. Technical assistance given. Standard 746.5101(a).

  4. Jul 16, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation did not have a current fire inspection report available for review. The last fire inspection was on 3/04/2025.

      Corrected Jul 30, 2026, verified Jul 24, 2026. Technical assistance given. Standard 746.5101(a).

  5. Jul 16, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation did not have a current fire inspection report available for review. The last fire inspection was on 3/04/2025.

      Corrected Jul 30, 2026, verified Jul 24, 2026. Technical assistance given. Standard 746.5101(a).

  6. 2025
  7. Aug 7, 2025 to Aug 7, 20254 inspections
    No findingsShow
    • Aug 7, 2025 inspection
    • Aug 7, 2025 inspection
    • Aug 7, 2025 inspection
    • Aug 7, 2025 inspection
  8. Jun 26, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4305.

    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4311.

  9. Jun 26, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4305.

    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4311.

  10. Jun 26, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4305.

  11. Jun 26, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jul 10, 2025, verified Aug 7, 2025. Technical assistance given. Standard 746.4305.

  12. Jun 6, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4305.

    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4311.

  13. Jun 6, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4305.

  14. Jun 6, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4305.

  15. Jun 6, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4305.

    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected Jun 13, 2025, verified Jun 26, 2025. Technical assistance given. Standard 746.4311.

  16. May 23, 2025Assessment
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area,

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4305.

  17. May 23, 2025Assessment
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area,

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4305.

  18. May 23, 2025Assessment
    2 findings · serious
    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4311.

    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area,

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4305.

  19. May 23, 2025Assessment
    2 findings · serious
    • SeriousTexas: Medium High

      Fenced Outdoor Activity Space

      The operation no longer has a fenced outdoor area,

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4305.

    • SeriousTexas: Medium High

      Outdoor Activity Space Accessible By Safe Route or get required approval of plan

      The operation does not have an approved plan to maintain safety of children outdoors while the new playground is being constructed.

      Corrected May 30, 2025, verified Jun 6, 2025. Technical assistance given. Standard 746.4311.

  20. Jan 24, 2025 to Jan 24, 20254 inspections
    No findingsShow
    • Jan 24, 2025 inspection
    • Jan 24, 2025 inspection
    • Jan 24, 2025 inspection
    • Jan 24, 2025 inspection
  21. Jan 10, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 6 infants in the infant room with one caregiver. Specified age group is 0-11 months. Over ratio by 2 Corrected at inspection when another staff arrived.

      Corrected Jan 10, 2025, verified Jan 24, 2025. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium

      Documented Annual Training Area - 24 Hours Required

      Two caregivers did not have the required 24 hours of annual training.

      Corrected Feb 14, 2025, verified Feb 18, 2025. Technical assistance given. Standard 746.1309(a).

  22. Jan 10, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium

      Documented Annual Training Area - 24 Hours Required

      Two caregivers did not have the required 24 hours of annual training.

      Corrected Feb 14, 2025, verified Feb 18, 2025. Technical assistance given. Standard 746.1309(a).

    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 6 infants in the infant room with one caregiver. Specified age group is 0-11 months. Over ratio by 2 Corrected at inspection when another staff arrived.

      Corrected Jan 10, 2025, verified Jan 24, 2025. Technical assistance given. Standard 746.1601.

  23. Jan 10, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 6 infants in the infant room with one caregiver. Specified age group is 0-11 months. Over ratio by 2 Corrected at inspection when another staff arrived.

      Corrected Jan 10, 2025, verified Jan 24, 2025. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium

      Documented Annual Training Area - 24 Hours Required

      Two caregivers did not have the required 24 hours of annual training.

      Corrected Feb 14, 2025, verified Feb 18, 2025. Technical assistance given. Standard 746.1309(a).

  24. Jan 10, 2025Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 6 infants in the infant room with one caregiver. Specified age group is 0-11 months. Over ratio by 2 Corrected at inspection when another staff arrived.

      Corrected Jan 10, 2025, verified Jan 24, 2025. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium

      Documented Annual Training Area - 24 Hours Required

      Two caregivers did not have the required 24 hours of annual training.

      Corrected Feb 14, 2025, verified Feb 18, 2025. Technical assistance given. Standard 746.1309(a).

  25. 2024
  26. Feb 2, 2024 to Feb 2, 20244 inspections
    No findingsShow
    • Feb 2, 2024 inspection
    • Feb 2, 2024 inspection
    • Feb 2, 2024 inspection
    • Feb 2, 2024 inspection
Show 12 older visits, not counted above
  1. 2023
  2. Mar 7, 2023 to Mar 7, 20234 inspections
    No findingsShow
    • Mar 7, 2023 inspection
    • Mar 7, 2023 inspection
    • Mar 7, 2023 inspection
    • Mar 7, 2023 inspection
  3. Feb 22, 2023Inspection
    4 findings · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a recent fire inspection report available for review. Last inspection done was on 2/14/2022.

      Corrected Mar 8, 2023, verified Feb 27, 2023. Technical assistance given. Standard 746.5101(a).

    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 19 children in a classroom with one caregiver. Specified age group is 3. Over ratio by 4. Corrected at inspection when another caregiver arrived.

      Corrected during the inspection. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium High

      Training Requirements for Employees and Caregivers - 24 Annual Training

      Four caregivers did not have the required 24 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(5)(A).

    • SeriousTexas: Medium High

      Training Requirements for Directors 30- Annual Training

      The Director does not have the required 30 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(6)(A).

  4. Feb 22, 2023Inspection
    4 findings · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a recent fire inspection report available for review. Last inspection done was on 2/14/2022.

      Corrected Mar 8, 2023, verified Feb 27, 2023. Technical assistance given. Standard 746.5101(a).

    • SeriousTexas: Medium High

      Training Requirements for Directors 30- Annual Training

      The Director does not have the required 30 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(6)(A).

    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 19 children in a classroom with one caregiver. Specified age group is 3. Over ratio by 4. Corrected at inspection when another caregiver arrived.

      Corrected during the inspection. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium High

      Training Requirements for Employees and Caregivers - 24 Annual Training

      Four caregivers did not have the required 24 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(5)(A).

  5. Feb 22, 2023Inspection
    4 findings · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a recent fire inspection report available for review. Last inspection done was on 2/14/2022.

      Corrected Mar 8, 2023, verified Feb 27, 2023. Technical assistance given. Standard 746.5101(a).

    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 19 children in a classroom with one caregiver. Specified age group is 3. Over ratio by 4. Corrected at inspection when another caregiver arrived.

      Corrected during the inspection. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium High

      Training Requirements for Employees and Caregivers - 24 Annual Training

      Four caregivers did not have the required 24 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(5)(A).

    • SeriousTexas: Medium High

      Training Requirements for Directors 30- Annual Training

      The Director does not have the required 30 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(6)(A).

  6. Feb 22, 2023Inspection
    4 findings · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a recent fire inspection report available for review. Last inspection done was on 2/14/2022.

      Corrected Mar 8, 2023, verified Feb 27, 2023. Technical assistance given. Standard 746.5101(a).

    • SeriousTexas: Medium High

      Child/ Caregiver Ratio - 13 or More Children

      There were 19 children in a classroom with one caregiver. Specified age group is 3. Over ratio by 4. Corrected at inspection when another caregiver arrived.

      Corrected during the inspection. Technical assistance given. Standard 746.1601.

    • SeriousTexas: Medium High

      Training Requirements for Directors 30- Annual Training

      The Director does not have the required 30 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(6)(A).

    • SeriousTexas: Medium High

      Training Requirements for Employees and Caregivers - 24 Annual Training

      Four caregivers did not have the required 24 clock hours of annual training.

      Corrected Mar 8, 2023, verified Mar 7, 2023. Technical assistance given. Standard 746.1301(5)(A).

  7. 2022
  8. Mar 23, 2022Inspection
    2 findings · serious
    • SeriousTexas: Medium

      Written Feeding Instructions - Review and Update Every 30 Days

      An infant did not have an updated feeding instruction available for review.

      Corrected Mar 25, 2022, verified Mar 23, 2022. Technical assistance given. Standard 746.2421(b).

    • SeriousTexas: Medium

      Written Operational Policies - Promotion of Physical Activity

      The operation has not included the promotion of indoor and outdoor physical activity in the operational policies.

      Corrected Mar 30, 2022, verified Mar 30, 2022. Technical assistance given. Standard 746.501(a)(18).

  9. Mar 23, 2022Inspection
    2 findings · serious
    • SeriousTexas: Medium

      Written Operational Policies - Promotion of Physical Activity

      The operation has not included the promotion of indoor and outdoor physical activity in the operational policies.

      Corrected Mar 30, 2022, verified Mar 30, 2022. Technical assistance given. Standard 746.501(a)(18).

    • SeriousTexas: Medium

      Written Feeding Instructions - Review and Update Every 30 Days

      An infant did not have an updated feeding instruction available for review.

      Corrected Mar 25, 2022, verified Mar 23, 2022. Technical assistance given. Standard 746.2421(b).

  10. Mar 23, 2022Inspection
    2 findings · serious
    • SeriousTexas: Medium

      Written Feeding Instructions - Review and Update Every 30 Days

      An infant did not have an updated feeding instruction available for review.

      Corrected Mar 25, 2022, verified Mar 23, 2022. Technical assistance given. Standard 746.2421(b).

    • SeriousTexas: Medium

      Written Operational Policies - Promotion of Physical Activity

      The operation has not included the promotion of indoor and outdoor physical activity in the operational policies.

      Corrected Mar 30, 2022, verified Mar 30, 2022. Technical assistance given. Standard 746.501(a)(18).

  11. Mar 23, 2022Inspection
    2 findings · serious
    • SeriousTexas: Medium

      Written Operational Policies - Promotion of Physical Activity

      The operation has not included the promotion of indoor and outdoor physical activity in the operational policies.

      Corrected Mar 30, 2022, verified Mar 30, 2022. Technical assistance given. Standard 746.501(a)(18).

    • SeriousTexas: Medium

      Written Feeding Instructions - Review and Update Every 30 Days

      An infant did not have an updated feeding instruction available for review.

      Corrected Mar 25, 2022, verified Mar 23, 2022. Technical assistance given. Standard 746.2421(b).

Source. This facility on the Texas HHSC search. Data reloaded nightly.

Think something here is wrong? Texas corrects its own records; here is how to ask them, and how to tell us. We change nothing ourselves.

Compare nearby

Licensed centers in zip 79707, same 36-month window.