Primrose East Allen
8 critical findings across 40 visits in the last 36 months. Most recent critical finding: Nov 10, 2025.
1604 E Exchange Pkwy, Allen, TX 75002 · (214) 547-7267
At a glance
Texas HHSC operation #1801402 · last checked against Texas Sep 15, 2026
Programs and services
From the Texas license. A dash means the state does not list it for this daycare.
- Meals providedyes
- Snacks providedyes
- Before-school carenot listed
- After-school careyes
- Transportation to/from schoolyes
- Drop-in carenot listed
- Part-time careyes
- Field tripsyes
- Skill classesyes
- Weekend carenot listed
- Night carenot listed
- Accreditedyes
- Accepts child care subsidiesyes
Inspection record
Every visit Texas has published, newest first. Visits with findings are shown in full; runs of clean visits are folded into one line. Findings are quoted from the inspector's report with the Texas risk level beside our severity.
- 2026
- Apr 16, 2026 to May 21, 20268 inspections and 4 investigationsNo findingsShow
- May 21, 2026 inspection
- May 21, 2026 inspection
- May 21, 2026 inspection
- May 21, 2026 inspection
- May 15, 2026 complaint investigation
- May 15, 2026 complaint investigation
- May 15, 2026 complaint investigation
- May 15, 2026 complaint investigation
- Apr 16, 2026 inspection
- Apr 16, 2026 inspection
- Apr 16, 2026 inspection
- Apr 16, 2026 inspection
- 2025
- Nov 10, 2025Assessment1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024. The operation did not obtain a fire inspection from the local fire department, nor were they able to provide written documentation showing that an attempt at obtaining a fire inspection from the local fire department was made by the original compliance due date of November 10, 2025.
Corrected Nov 17, 2025, verified Nov 17, 2025. Technical assistance given. Standard 746.5101(a).
- Nov 10, 2025Assessment1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024. The operation did not obtain a fire inspection from the local fire department, nor were they able to provide written documentation showing that an attempt at obtaining a fire inspection from the local fire department was made by the original compliance due date of November 10, 2025.
Corrected Nov 17, 2025, verified Nov 17, 2025. Technical assistance given. Standard 746.5101(a).
- Nov 10, 2025Assessment1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024. The operation did not obtain a fire inspection from the local fire department, nor were they able to provide written documentation showing that an attempt at obtaining a fire inspection from the local fire department was made by the original compliance due date of November 10, 2025.
Corrected Nov 17, 2025, verified Nov 17, 2025. Technical assistance given. Standard 746.5101(a).
- Nov 10, 2025Assessment1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024. The operation did not obtain a fire inspection from the local fire department, nor were they able to provide written documentation showing that an attempt at obtaining a fire inspection from the local fire department was made by the original compliance due date of November 10, 2025.
Corrected Nov 17, 2025, verified Nov 17, 2025. Technical assistance given. Standard 746.5101(a).
- Oct 27, 2025Inspection1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024.
Corrected Nov 17, 2025, verified Nov 10, 2025. Technical assistance given. Standard 746.5101(a).
- Oct 27, 2025Inspection1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024.
Corrected Nov 17, 2025, verified Nov 10, 2025. Technical assistance given. Standard 746.5101(a).
- Oct 27, 2025Inspection1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024.
Corrected Nov 17, 2025, verified Nov 10, 2025. Technical assistance given. Standard 746.5101(a).
- Oct 27, 2025Inspection1 finding · critical
- CriticalTexas: High
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
A fire inspection has not been completed by the City of Allen in the past 12 months. The last fire inspection completed was dated September 20, 2024.
Corrected Nov 17, 2025, verified Nov 10, 2025. Technical assistance given. Standard 746.5101(a).
- Jan 23, 2025 to Jan 23, 20254 inspectionsNo findingsShow
- Jan 23, 2025 inspection
- Jan 23, 2025 inspection
- Jan 23, 2025 inspection
- Jan 23, 2025 inspection
- 2024
- Sep 26, 2024 to Dec 3, 202416 inspectionsNo findingsShow
- Dec 3, 2024 inspection
- Dec 3, 2024 inspection
- Dec 3, 2024 inspection
- Dec 3, 2024 inspection
- Oct 29, 2024 inspection
- Oct 29, 2024 inspection
- Oct 29, 2024 inspection
- Oct 29, 2024 inspection
- Oct 10, 2024 inspection
- Oct 10, 2024 inspection
- Oct 10, 2024 inspection
- Oct 10, 2024 inspection
- Sep 26, 2024 inspection
- Sep 26, 2024 inspection
- Sep 26, 2024 inspection
- Sep 26, 2024 inspection
Source. This facility on the Texas HHSC search. Data reloaded nightly.
Think something here is wrong? Texas corrects its own records; here is how to ask them, and how to tell us. We change nothing ourselves.
Compare nearby
Licensed centers in zip 75002, same 36-month window.
| Daycare | Ages | Places | Hours | Findings, 36 mo |
|---|---|---|---|---|
| Primrose East Allen this page | Infant–School | 253 | 6:30a–6:30p | 8 crit |
| Alphabest @ Lovejoy - Lovejoy | Pre-K–School | 100 | 3:30p–6:30p | No findings |
| Big Blue Marble Academy Allen | Infant–School | 356 | 6:30a–6:30p | 36 crit·76 ser |
| Brookhaven Preschool | Infant–School | 120 | 7a–6:30p | 8 crit·16 ser |
| Carrie L Lovejoy Child Development Center | Toddler–Pre-K | 336 | 7a–6p | Clear |
| Children's Lighthouse of Allen | Infant–School | 238 | 6:30a–6:30p | 4 crit·24 ser·4 min |
| Childrens Creative Playday | Toddler–School | 145 | 9a–1:45p | Clear |
- Primrose East Allenthis pageInfant–School · 253 places8 crit
- Pre-K–School · 100 placesNo findings
- Infant–School · 356 places36 crit·76 ser
- Infant–School · 120 places8 crit·16 ser
- Toddler–Pre-K · 336 placesClear
- Infant–School · 238 places4 crit·24 ser·4 min
- Toddler–School · 145 placesClear