Skip to content
cubbycheck
Licensed centerLicensed

Metroplex Gymnastics

8 critical, 12 serious findings across 40 visits in the last 36 months. Most recent critical finding: Jun 23, 2026.

205 E Bethany Dr, Allen, TX 75002 · (972) 727-9095

At a glance

Inspection record · 36 monthsAllen licensed centers, n=36
Critical findings8 critical, 12 serious, 0 minor across 36 inspections and 4 investigations (40 visits). Most recent critical: Jun 23, 2026.
Critical8 vs median 4
61% of centers have at least one
Serious12 vs median 6
58% of centers have at least one
LicenseSince 2022Full Permit
Practical9a–6pMon–Fri · Pre-K to school · Licensed capacity 204

Texas HHSC operation #1720035 · last checked against Texas Sep 15, 2026

Budget & timing

Tuition & openings

We don’t yet have provider-confirmed prices or availability for this facility. A missing price does not mean care is free.

What will care cost?

Not provided

Ask for a written quote for your child’s age, days per week, and daily hours.

Tuition & billing schedule
Confirm with provider
Registration & supply fees
Confirm with provider
Deposit & refund policy
Confirm with provider
Meals & late pickup fees
Confirm with provider

When can my child start?

Not confirmed

Licensed capacity is the maximum permitted enrollment, not the number of open places.

  • Ask about openings in your child’s age group.
  • Confirm the earliest start date and available schedule.
  • Ask about waitlist fees, timing, and how offers are made.
Help paying for care: The state lists subsidies as not accepted. Confirm current payment options with the provider.
Call about tuition & openings

Programs and services

From the Texas license. “Not listed” means unknown, not that a service is unavailable. Confirm current services with the provider.

  • Meals providedNot listed
  • Snacks providedNot listed
  • Before-school careNot listed
  • After-school careListed
  • Transportation to/from schoolListed
  • Drop-in careNot listed
  • Part-time careNot listed
  • Field tripsNot listed
  • Skill classesNot listed
  • Weekend careNot listed
  • Night careNot listed
  • AccreditedNot listed
  • Accepts child care subsidiesNot accepted
Ask about your child’s needs. Curriculum, languages spoken, accessibility, disability support, allergy accommodations, and staff qualifications are not included in our current data. Discuss these directly when you visit.

Inspection record

Visits available in our Texas data, newest first. Visits with findings are shown in full; runs of clean visits are folded into one line. Findings are quoted from the inspector's report with the Texas risk level beside our severity.

Inspection history is one input into your decision, not a guarantee of safety or a rating of care quality. How to read this record.

  1. 2026
  2. Jun 29, 2026 to Aug 6, 20268 inspections
    No findingsShow
    • Aug 6, 2026 inspection
    • Aug 6, 2026 inspection
    • Aug 6, 2026 inspection
    • Aug 6, 2026 inspection
    • Jun 29, 2026 inspection
    • Jun 29, 2026 inspection
    • Jun 29, 2026 inspection
    • Jun 29, 2026 inspection
  3. Jun 23, 2026Complaint investigation
    2 findings · critical
    • CriticalTexas: High

      Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity

      It was determined that at least two children were unsupervised in an empty classroom pushing on a door. While this was occurring, a third child is seen pulling on the door and staff were not aware of what was happening.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.1205(a)(4).

    • SeriousTexas: Medium High

      Maintenance of Building, Grounds and Equipment

      It was determined that the Dutch door in between the classrooms had a broken latch that prevented both halves of the door to be latched. As a result, both halves of the door could swing independently of each other causing a safety concern.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.2507.

  4. Jun 23, 2026Complaint investigation
    2 findings · critical
    • CriticalTexas: High

      Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity

      It was determined that at least two children were unsupervised in an empty classroom pushing on a door. While this was occurring, a third child is seen pulling on the door and staff were not aware of what was happening.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.1205(a)(4).

    • SeriousTexas: Medium High

      Maintenance of Building, Grounds and Equipment

      It was determined that the Dutch door in between the classrooms had a broken latch that prevented both halves of the door to be latched. As a result, both halves of the door could swing independently of each other causing a safety concern.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.2507.

  5. Jun 23, 2026Complaint investigation
    2 findings · critical
    • CriticalTexas: High

      Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity

      It was determined that at least two children were unsupervised in an empty classroom pushing on a door. While this was occurring, a third child is seen pulling on the door and staff were not aware of what was happening.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.1205(a)(4).

    • SeriousTexas: Medium High

      Maintenance of Building, Grounds and Equipment

      It was determined that the Dutch door in between the classrooms had a broken latch that prevented both halves of the door to be latched. As a result, both halves of the door could swing independently of each other causing a safety concern.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.2507.

  6. Jun 23, 2026Complaint investigation
    2 findings · critical
    • CriticalTexas: High

      Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity

      It was determined that at least two children were unsupervised in an empty classroom pushing on a door. While this was occurring, a third child is seen pulling on the door and staff were not aware of what was happening.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.1205(a)(4).

    • SeriousTexas: Medium High

      Maintenance of Building, Grounds and Equipment

      It was determined that the Dutch door in between the classrooms had a broken latch that prevented both halves of the door to be latched. As a result, both halves of the door could swing independently of each other causing a safety concern.

      Corrected Jul 21, 2026, verified Aug 6, 2026. Technical assistance given. Standard 744.2507.

  7. Jun 4, 2026Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Caring for Children Above or Below Ground Level-Written Approval

      During the inspection at the program children were present and engaging in activites on the second level of the facility without written fire marshal approval. The director did relocate the children to another area of the facility during the inspection and the children will no longer be present on the second level until the fire marshal gives the approval.

      Corrected during the inspection. Technical assistance given. Standard 744.2911(1).

    • SeriousTexas: Medium High

      Training Requirements for Employees - 15 clock hours Annual Training for Caregivers & Site Directors

      At the time of inspection 9 of the staff whose records/trainings were reviewed did not have record of their previous full year's training or certificates.

      Corrected Jun 19, 2026, verified Jun 19, 2026. Technical assistance given. Standard 744.1301(a)(5)(A).

  8. Jun 4, 2026Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Training Requirements for Employees - 15 clock hours Annual Training for Caregivers & Site Directors

      At the time of inspection 9 of the staff whose records/trainings were reviewed did not have record of their previous full year's training or certificates.

      Corrected Jun 19, 2026, verified Jun 19, 2026. Technical assistance given. Standard 744.1301(a)(5)(A).

    • SeriousTexas: Medium High

      Caring for Children Above or Below Ground Level-Written Approval

      During the inspection at the program children were present and engaging in activites on the second level of the facility without written fire marshal approval. The director did relocate the children to another area of the facility during the inspection and the children will no longer be present on the second level until the fire marshal gives the approval.

      Corrected during the inspection. Technical assistance given. Standard 744.2911(1).

  9. Jun 4, 2026Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Training Requirements for Employees - 15 clock hours Annual Training for Caregivers & Site Directors

      At the time of inspection 9 of the staff whose records/trainings were reviewed did not have record of their previous full year's training or certificates.

      Corrected Jun 19, 2026, verified Jun 19, 2026. Technical assistance given. Standard 744.1301(a)(5)(A).

    • SeriousTexas: Medium High

      Caring for Children Above or Below Ground Level-Written Approval

      During the inspection at the program children were present and engaging in activites on the second level of the facility without written fire marshal approval. The director did relocate the children to another area of the facility during the inspection and the children will no longer be present on the second level until the fire marshal gives the approval.

      Corrected during the inspection. Technical assistance given. Standard 744.2911(1).

  10. Jun 4, 2026Inspection
    2 findings · serious
    • SeriousTexas: Medium High

      Training Requirements for Employees - 15 clock hours Annual Training for Caregivers & Site Directors

      At the time of inspection 9 of the staff whose records/trainings were reviewed did not have record of their previous full year's training or certificates.

      Corrected Jun 19, 2026, verified Jun 19, 2026. Technical assistance given. Standard 744.1301(a)(5)(A).

    • SeriousTexas: Medium High

      Caring for Children Above or Below Ground Level-Written Approval

      During the inspection at the program children were present and engaging in activites on the second level of the facility without written fire marshal approval. The director did relocate the children to another area of the facility during the inspection and the children will no longer be present on the second level until the fire marshal gives the approval.

      Corrected during the inspection. Technical assistance given. Standard 744.2911(1).

  11. May 20, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation's last documented fire inspection by the local fire marshal was on 4/15/25. No fire inspection has been conducted for this year just yet.

      Corrected Jun 5, 2026, verified Jun 4, 2026. Technical assistance given. Standard 744.3501(a).

  12. May 20, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation's last documented fire inspection by the local fire marshal was on 4/15/25. No fire inspection has been conducted for this year just yet.

      Corrected Jun 5, 2026, verified Jun 4, 2026. Technical assistance given. Standard 744.3501(a).

  13. May 20, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation's last documented fire inspection by the local fire marshal was on 4/15/25. No fire inspection has been conducted for this year just yet.

      Corrected Jun 5, 2026, verified Jun 4, 2026. Technical assistance given. Standard 744.3501(a).

  14. May 20, 2026Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation's last documented fire inspection by the local fire marshal was on 4/15/25. No fire inspection has been conducted for this year just yet.

      Corrected Jun 5, 2026, verified Jun 4, 2026. Technical assistance given. Standard 744.3501(a).

  15. 2025
  16. Jun 24, 2025 to Jul 29, 20258 inspections
    No findingsShow
    • Jul 29, 2025 inspection
    • Jul 29, 2025 inspection
    • Jul 29, 2025 inspection
    • Jul 29, 2025 inspection
    • Jun 24, 2025 inspection
    • Jun 24, 2025 inspection
    • Jun 24, 2025 inspection
    • Jun 24, 2025 inspection
  17. 2024
  18. Jul 19, 2024 to Aug 6, 20248 inspections
    No findingsShow
    • Aug 6, 2024 inspection
    • Aug 6, 2024 inspection
    • Aug 6, 2024 inspection
    • Aug 6, 2024 inspection
    • Jul 19, 2024 inspection
    • Jul 19, 2024 inspection
    • Jul 19, 2024 inspection
    • Jul 19, 2024 inspection
  19. 2023
  20. Sep 18, 2023 to Sep 18, 20234 inspections
    No findingsShow
    • Sep 18, 2023 inspection
    • Sep 18, 2023 inspection
    • Sep 18, 2023 inspection
    • Sep 18, 2023 inspection
Show 36 older visits, not counted above
  1. Mar 9, 2023 to Mar 9, 20234 inspections
    No findingsShow
    • Mar 9, 2023 inspection
    • Mar 9, 2023 inspection
    • Mar 9, 2023 inspection
    • Mar 9, 2023 inspection
  2. 2022
  3. Jun 2, 2022 to Sep 12, 202220 inspections and 4 investigations
    No findingsShow
    • Sep 12, 2022 inspection
    • Sep 12, 2022 inspection
    • Sep 12, 2022 inspection
    • Sep 12, 2022 inspection
    • Jul 27, 2022 inspection
    • Jul 27, 2022 inspection
    • Jul 27, 2022 inspection
    • Jul 27, 2022 inspection
    • Jul 26, 2022 complaint investigation
    • Jul 26, 2022 inspection
    • Jul 26, 2022 inspection
    • Jul 26, 2022 complaint investigation
    • Jul 26, 2022 complaint investigation
    • Jul 26, 2022 inspection
    • Jul 26, 2022 complaint investigation
    • Jul 26, 2022 inspection
    • Jun 10, 2022 inspection
    • Jun 10, 2022 inspection
    • Jun 10, 2022 inspection
    • Jun 10, 2022 inspection
    • Jun 2, 2022 inspection
    • Jun 2, 2022 inspection
    • Jun 2, 2022 inspection
    • Jun 2, 2022 inspection
  4. Feb 22, 2022Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Mar 1, 2022, verified Mar 8, 2022. Technical assistance given. Standard 744.3501(a).

  5. Feb 22, 2022Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Mar 1, 2022, verified Mar 8, 2022. Technical assistance given. Standard 744.3501(a).

  6. Feb 22, 2022Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Mar 1, 2022, verified Mar 8, 2022. Technical assistance given. Standard 744.3501(a).

  7. Feb 22, 2022Inspection
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Mar 1, 2022, verified Mar 8, 2022. Technical assistance given. Standard 744.3501(a).

  8. Jan 31, 2022Assessment
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Jan 31, 2022, verified Feb 22, 2022. Standard 744.3501(a).

  9. Jan 31, 2022Assessment
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Jan 31, 2022, verified Feb 22, 2022. Standard 744.3501(a).

  10. Jan 31, 2022Assessment
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Jan 31, 2022, verified Feb 22, 2022. Standard 744.3501(a).

  11. Jan 31, 2022Assessment
    1 finding · critical
    • CriticalTexas: High

      Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months

      The operation does not have a current fire inspection.

      Corrected Jan 31, 2022, verified Feb 22, 2022. Standard 744.3501(a).

Source. This facility on the Texas HHSC search. Data reloaded nightly.

Think something here is wrong? Texas corrects its own records; here is how to ask them, and how to tell us. We change nothing ourselves.

Your next step

Make the most of a visit

Bring these questions when you call or tour. Check them off as you discuss them; selections last until you leave or reload this page.

Compare nearby

Licensed centers in zip 75002, same 36-month window.